I learned this in pretty major spades on my current project. I was so *focused and busy* on producing the thing that I thought the customer wanted, that I stopped listening to her.
I never came up for air; I never had time to!
I was so sure that what I was producing was the RIGHT thing, that I ended up being WRONG.
I adopted a very "waterfall" mentality on this project because I was under the gun, behind, etc. But from the beginning. This is no way to run a project.
Never start a project without a signed SOW.
No comments:
Post a Comment